Logistics Centres, Warehouses and E-Commerce
Logistics facilities are built on the city fringe, run at night and change staff often. Together, those three age a shuttle plan faster than anything else. vitaRoute renews the plan the same day.

The industry's problem
Why is shuttle service hard in this sector?
Warehouses and distribution centres sit on the city fringe, where public transport is not a practical option. Staff reach the site only by shuttle, and routes are long. Shifts often begin at night or before dawn, which falls at hours when the roads are emptier but riskier.
The operation itself is variable too. During campaign periods headcount multiplies, then falls back quickly when the season ends. The passenger list changes weekly, sometimes daily; if the plan can't keep up with that pace, you end up with either too little capacity or empty vehicles.
At e-commerce and distribution centres, the price of one late arrival is paid directly at the departure time: a delayed dispatch, trucks waiting, a promise to the customer lost.
- A city-fringe location with no public transport
- Shifts starting at night and before dawn
- Headcount that multiplies in campaign periods
- High turnover, a constantly changing list
In the field
A day at a distribution centre with night shifts
- During the day
Tomorrow's employee list is uploaded
Bulk staff entry is done with Excel. Temporary staff added during the campaign period enter the plan the same way.
- 21:00
Night shift pickup
Night trips are planned with travel times for night traffic and with lit, designated stops.
- 05:30
Early-morning departure
Outbound trips are sequenced according to the direction employees head home. Vehicle occupancy is tracked live.
- End of period
The list shrinks, the fleet shrinks too
When the campaign ends, headcount falls. The plan is rebuilt at the same speed; no vehicles are left idle.

The campaign arrived and headcount multiplied. The plan has to catch up the same day.
What does vitaRoute do in this sector?
Logistics Centres, Warehouses and E-Commerce
Night shift planning
Night trips are planned with their own rules: travel times for night traffic, a shorter walking distance and designated stops.
- Travel times for night traffic
- Short walking distance
- Designated, lit stops
A flexible setup for seasonal staff
Bulk staff entry is done with Excel and the plan is built the same day. When the campaign ends, the list shrinks and the vehicle count falls at the same pace; vehicles sitting idle are clearly visible.
- Bulk staff entry with Excel
- Same-day adaptation to seasonal rises and falls
- A clear count of idle vehicles
A plan that measures and reduces delays
The plan is calculated backwards from the shift start. By comparing it with completed trips, chronic delay zones are identified and corrected in the next plan.
- Plan backwards from the shift start
- Planned vs. actual comparison
- Identification of chronic delay zones
Before / after
Four situations in the field, two approaches
Headcount multiplied during campaign week
Managed by hand
The shuttle plan can't keep up; extra vehicles are found at the last minute, at a premium.
With vitaRoute
The list is uploaded and the plan is built the same day; the number of vehicles needed is known in advance.
The period ended and staff numbers dropped
Managed by hand
Vehicles keep running half empty.
With vitaRoute
The plan is rebuilt and the vehicle count falls at the same pace as the passenger count.
Stop safety at 03:00 at night
Managed by hand
Staff are picked up at the roadside, in the dark.
With vitaRoute
On night trips: a shorter walking distance and designated, lit stops.
Chronic delays in the same area
Managed by hand
The cause isn't understood and the driver gets blamed.
With vitaRoute
Planned and actual are compared; the area where delays occur is identified and corrected in the next plan.
The most used solutions in this sector
Logistics Centres, Warehouses and E-Commerce
Explore
Other sectors
Frequently asked questions
The new staff list is uploaded with Excel and the plan is built the same day. The number of vehicles needed is calculated in advance; when the period ends, it is scaled back at the same pace.
Go into your next campaign with the plan ready.
Upload your employee list and shift times, and see your first plan in minutes.