Case Studies
Real Operations, Proven Results
Measurable outcomes from companies that adopted vitaRoute in their own operations.
Metropol Transit Inc. — Istanbul Asia, 42 schools, 2,800 students
Problem
3+ hours of daily manual planning, drivers taking wrong routes, parent complaints.
Solution
Automated route planning with vitaRoute API: optimized routes generated in seconds every morning.
40%
Shorter Journey
8 min
Daily Planning
22%
Fuel Savings
0
Complaints (pilot month)
Anadolu Production Facility — Gebze OSB, 650 staff, 3 shifts
Problem
Manual list copying from ERP, empty vehicle returns, shift delays.
Solution
ERP integration + vitaRoute dynamic shift planning automating all three shifts.
87%
Vehicle Occupancy
31%
Fuel Reduction
3 Shifts
Automated
8.7/10
Staff Satisfaction
SwiftCargo Logistics — Istanbul, 120 vehicles, 800+ daily deliveries
Problem
71% delivery success rate, high return rate, complex driver scheduling.
Solution
Multi-depot optimization + time-windowed delivery for city-wide fleet coordination.
94%
Delivery Success
23 km
Savings per Vehicle
2.4%
Return Rate
+31 NPS
Customer Score
Join the Pilot Program
Let us analyze your operation and prepare a custom impact report. No commitment, no credit card required.
Contact Us